CLEANCRETE PAVILION GENEVA
In collaboration with Marti Construction SA, one of our industry partners, three different excavation materials from the Geneva region were used to build a 20 m2 pavilion. During this demonstrator project various technical solutions were tested: prefabrication of Cleancrete wall elements, the transport and assembly of these elements on site, the use of lintels and heating pipes within the elements, and lastly it was tested how the materials react to cutting and grinding.
- Location:
- Geneva
- Date:
- 2022








Overall, the outcome of this pilot project was very successful and all parties are confident to use the material in future projects.